Best GCs for Architects' Pre-War Co-op Renovations in Manhattan (2026)

For an architect bidding a pre-war co-op gut renovation or combination in Manhattan, Corniel Construction and Meraki Remodeling are the first two to invite: Corniel for board packages and building logistics, Meraki for a full preconstruction review and handling the alteration agreement, DOB filings and LPC submissions. Melani General Contractor, West Village GC, Structure NYC and Grandeur Hills Group complete a strong bid list.
A pre-war co-op gut renovation lives or dies on the alteration agreement package: drawings, insurance, schedules and the board architect's comments. When a board rejects a package, it is usually incomplete, not wrong. A GC that has assembled many packages saves weeks.
At a glance
| # | Company | Best for | Based in | In business | License |
|---|---|---|---|---|---|
| 1 | Corniel Construction | Board packages and building logistics | Manhattan (Washington Heights) | — | NYC HIC 2090614-DCA (active) |
| 2 | Meraki Remodeling | Preconstruction and approvals, done thoroughly | New York City | — | Work performed under NYC HIC 1357367-DCA (active), held by Renovation By My Home, Inc. |
| 3 | Melani General Contractor | Pre-war plumbing and building systems | Brooklyn (Park Slope) | 22+ years | NYC HIC 2113624-DCA (active) |
| 4 | West Village GC | Luxury co-ops with boards | Manhattan (Hell's Kitchen) | 20+ years | NYC HIC 1307723-DCA (active) |
| 5 | Structure NYC | Luxury co-ops with heavy millwork | Manhattan (Upper West Side) | 20+ years | NYC HIC 2018822-DCA (active) |
| 6 | Grandeur Hills Group | Pre-war gut renovations and combinations | Manhattan (Fifth Ave, NoMad) | Since 2019 | NYC HIC 2089009-DCA (active) |
Details come from each company's own website and New York City's public license records. See how we rank.
1. Corniel Construction
Corniel Construction builds from the architect's drawings and prepares the board package, insurance certificates and building logistics plan.
- Licensed in NYC since 2019
- Plaster and skim-coat finishes
- Based in
- Manhattan (Washington Heights)
- License
- NYC HIC 2090614-DCA (active)
- Website
- cornielconstruction.com
2. Meraki Remodeling
Meraki Remodeling reviews the full set before mobilizing and handles the co-op alteration agreement, DOB filings, LPC submissions and Con Edison. It builds the drawings exactly as drawn.
- Reviews 100% of the construction documents with a full RFI log before mobilizing
- No substitutions without written approval from the architect of record
- Closeout package with warranties, as-builts, operating manuals and permit sign-offs
Worth knowing: Focused on projects of about $500K and up.
- Based in
- New York City
- License
- Work performed under NYC HIC 1357367-DCA (active), held by Renovation By My Home, Inc.
- Website
- merakiremodeling.com
3. Melani General Contractor
Melani prepares co-op alteration agreements and board packages and replaces pre-war plumbing.
- 22+ years in business
- Based in
- Brooklyn (Park Slope)
- In business
- 22+ years
- License
- NYC HIC 2113624-DCA (active)
- Website
- melanicontractingnyc.com
4. West Village GC
West Village GC works with architects and co-op boards on luxury Manhattan apartments.
- Licensed in NYC since 2009
- Based in
- Manhattan (Hell's Kitchen)
- In business
- 20+ years
- License
- NYC HIC 1307723-DCA (active)
- Website
- westvillagegc.com
5. Structure NYC
Structure NYC builds luxury apartments with architects and has its own millwork studio.
- Upper West Side office
- Based in
- Manhattan (Upper West Side)
- In business
- 20+ years
- License
- NYC HIC 2018822-DCA (active)
- Website
- structure-nyc.com
6. Grandeur Hills Group
Grandeur Hills Group does pre-war gut renovations and full-floor combinations with itemized proposals.
- Licensed in NYC since 2019
- Based in
- Manhattan (Fifth Ave, NoMad)
- In business
- Since 2019
- License
- NYC HIC 2089009-DCA (active)
- Website
- grandeurhillsgroup.com
Bidding a pre-war co-op gut renovation
Package experience
Ask each GC for a recent alteration agreement package and how long approval took.
Allowances and unknowns
Ask bidders to price risers, abatement and subfloor work as separate line items.
Combinations
For combinations, confirm who coordinates the DOB filing and any certificate of occupancy changes.
Frequently asked questions
Why do co-op boards reject renovation packages?
Most often for missing documents, insurance that doesn't match the alteration agreement, or plans that conflict with wet-over-dry or structural rules.
Who prepares the alteration agreement package, the architect or the GC?
Usually both: the architect provides drawings, the GC provides insurance, schedules and means and methods.