What Is an Alteration Agreement in an NYC Co-op or Condo?

An alteration agreement is the contract between you and your co-op or condo building that sets the rules for your renovation. It typically covers plan review by the building's architect or engineer, the contractor's insurance, a security deposit, work hours, summer restrictions, rules about kitchens and bathrooms over neighbors' living space, and who pays for damage. You sign it before any work starts, and your contractor must follow it too.
What an alteration agreement is for
In an NYC co-op, the proprietary lease usually says you cannot alter your apartment without the board's consent. The alteration agreement is how the board gives that consent: it lists the conditions you accept in exchange for permission to renovate. Condos use similar agreements under their bylaws and rules, though condo boards typically have narrower control over interior work.
The agreement protects the building and your neighbors from leaks, structural damage, noise and disruption. For you, it is the rulebook your design and schedule must fit. Reading it before your architect finalizes drawings saves weeks of revisions later.
Typical clauses you will see
No two buildings use identical agreements, but most NYC alteration agreements cover the following.
- Plan review: drawings must be reviewed and approved by the building's architect or engineer before work begins, at your expense.
- Insurance: your contractor and trades must carry liability and workers' compensation coverage at stated minimums, naming the building, corporation and managing agent as additional insureds.
- Security deposit: a refundable deposit held against damage and compliance, returned after a final inspection and sign-off.
- Fees: review fees, processing fees and sometimes per-round or per-month supervision fees.
- Work hours: commonly weekday business hours only, with no work on weekends or holidays, and limits on noisy work.
- Summer rules: many co-ops restrict or ban non-emergency renovation over the summer.
- Wet-over-dry: limits on placing kitchens, bathrooms or laundry above a neighbor's living or bedroom space.
- Completion deadline: a set time to finish, sometimes with daily penalties for overruns.
- Building systems: rules on risers, gas, electrical capacity, HVAC, windows and washer-dryers.
- Protection and logistics: freight elevator bookings, hallway protection, debris removal and who the super coordinates with.
- Indemnity and damage: you are responsible for damage your renovation causes to the building or neighbors.
Insurance and deposits in practice
Insurance is the item that most often delays a start. The building will usually provide sample certificate wording and required limits. Give it to the contractor early, ask for certificates issued exactly to that wording, and check that each trade, not only the general contractor, is covered.
Security deposits are typically refunded after the building's final inspection confirms there is no damage and all paperwork, such as permit sign-offs, is complete. Keep your own photos of the hallway and elevator before work starts; they help if there is a dispute about damage.
Wet-over-dry and plumbing rules
Wet-over-dry clauses are among the most important in NYC buildings, especially pre-war co-ops with old plumbing. A 'wet' room is one with water fixtures; a 'dry' room is a bedroom or living space. Many buildings prohibit moving a kitchen or bathroom so that it sits over a neighbor's dry space, or allow it only with enhanced waterproofing and the reviewer's approval.
Agreements also tend to control riser work, shut-off valves and whether new fixtures can tie into existing lines. If your design depends on relocating plumbing, raise it with your architect and the managing agent before drawings go in.
Who handles what
You, the shareholder or unit owner, sign the agreement and remain responsible for compliance. Your architect usually prepares drawings and answers the building reviewer. Your general contractor provides licenses and insurance, schedules work within allowed hours, books the freight elevator and protects common areas. The managing agent administers the process, and the super is the day-to-day contact for access, shut-offs and building rules.
Put these responsibilities in your contract with the contractor. If the agreement imposes deadlines or penalties, ask how the contractor's schedule accounts for them, and who pays if the contractor causes a delay.
Where projects most often run into trouble
Most problems with alteration agreements are not dramatic disputes. They are small mismatches between what the owner planned and what the agreement allows, discovered late. A design that moves the kitchen across the apartment, a washer-dryer the building does not permit, or hard flooring without the required sound underlayment can each send drawings back for revision.
Schedule clauses are the other common pain point. If the agreement sets a completion deadline of, say, a few months for a kitchen and the contractor's schedule needs longer, raise it before you sign rather than after work starts. Likewise, if your building has a summer restriction, check that the construction window still fits once approval time is included.
- Read the house rules alongside the agreement; they often hold the detailed restrictions.
- Ask for any separate renovation guidelines or plan-review checklist the building's architect uses.
- Confirm whether flooring needs a specific soundproofing standard or a minimum coverage of rugs.
- Check rules on window replacement, through-wall air conditioners and HVAC, which often need separate approval.
- Ask how the building handles permit sign-offs and what it needs before returning the deposit.
Negotiating, signing and legal questions
Before you sign, make sure you have the current version of the agreement, the house rules and the fee schedule, and that your architect and contractor have read them too. Confirm the insurance wording with your contractor's broker, budget for every fee and deposit, and note every date restriction on your project calendar. If anything in the agreement conflicts with your design or schedule, resolve it in writing with the managing agent first.
Alteration agreements are mostly standard forms, and boards rarely change the core terms. Some points, such as a completion deadline for a large project or a specific design exception, can sometimes be discussed with the managing agent before you sign.
The agreement is a binding legal document that can affect your shares, your deposit and your liability to neighbors. For questions about what a clause means for you, indemnity terms, penalties or disputes, consult a real estate attorney. This guide is general information, not legal advice.
Frequently asked questions
Do condos have alteration agreements?
Yes, most NYC condos require one, though condo boards typically have less power to refuse interior work than co-op boards. Expect insurance, deposits, work hours and plan review for anything beyond cosmetic work.
When do I get my alteration deposit back?
Usually after the building's final inspection, once any damage is resolved and required sign-offs, such as DOB permit sign-offs, are delivered. Timing varies; ask the managing agent what triggers the refund.
Can my contractor sign the alteration agreement for me?
The agreement is between you and the building, so you sign it. Many buildings also ask the contractor to sign an acknowledgment or a separate contractor's agreement.
What happens if my renovation runs past the deadline in the agreement?
Some agreements allow the building to charge daily fees or take other action. Ask early for an extension if delays are likely, and make sure your contractor's contract addresses responsibility for delays.
Should a lawyer review my alteration agreement?
For large renovations, combinations or structural work, many owners have a real estate attorney review it. Any legal question about the agreement should go to an attorney.